Christmas Day Work Breakdown Structure ( A bit of fun!!)

 

NAME RESOURCE WORK/TIME
Christmas Day arrives 0 hours
1 Morning
2 All wake up Children/Mum and Dad
3 Children open stockings Children 1.5 hours
4 Give hugs/kisses/express love Whole Family 30 minutes
5 Turn oven on for turkey Mum   5 minutes
6 Breakfast 1 hour 25m
7 Fry bacon/cook eggs Dad 30 minutes
8 Lay Table Children   5 minutes
9 Eat Together Whole Family 30 minutes
10 Put turkey in oven Mum  5 minutes
11 Clear up Mum/Dad 15 minutes
12 Open Gifts/Prepare lunch 2 hours 40m
13 Take turns opening one gift each Whole Family 30 minutes
14 Assemble toys Mum/Dad 30 minutes
15 Play Whole Family 30 minutes
16 Clear up Mum/Dad 10 minutes
17 Put spuds in oven/cook veg etc Mum 1 hour
18 Getting ready 1 hour 30m
19 Children shower and get ready Children 30 minutes
20 Dad showers and gets ready Dad 20 minutes
21 Mum showers and gets ready Mum 30 minutes
22 Dad checks dinner/ bastes turkey Dad 10 minutes
23 Grandparents arrive 1 hour
24 Open gifts Whole Family 30 minutes
25 Give hugs/kisses/express love Whole Family 30 minutes
26 Christmas lunch 2 hours 10m
27 Lay table Mum/Dad 10 minutes
28 All eat lunch Whole Family 45 minutes
29 Pull crackers/tell jokes Whole Family 15 minutes
30 Table fireworks Whole Family 30 minutes
31 Clear up Mum/Dad 30 minutes
32 Afternoon 3 hours 15m
33 Watch Queen Speech Mum/Dad/Grandparents 10 minutes
34 Find quiet place to snooze Mum/Dad/Grandparents 1 hour
35 Play with Children Whole Family 45 minutes
36 Watch TV Whole family 1 hour
37 Prepare tea and cake Mum 10 minutes
38 Drink Tea/Christmas cake Whole Family 10 minutes
39 Evening 3 hours 10m
40 Say goodbye to grandparents Whole Family 10 minutes
41 Watch a Christmas Film/snack Whole family 1.5 hours
42 Get kids to bed Mum/Dad/children 30 minutes
43 Chat, Reflect on day and go to bed Mum/Dad 1 hour
44 Christmas day comes to an end 0 hours

 

Sitemap | © 20|20 Business Insight 2015. | A Wordpress Website by exSite
PRINCE2® is a registered trade mark of AXELOS Limited. The Swirl logo™ is a trade mark of AXELOS Limited.
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc. | PMI, PMP, CAPM and PMBOK are registered marks of the Project Management Institute, Inc.
20|20 Business Insight Ltd Registered Office: Whitehall House, 33 Yeaman Shore, Dundee, DD1 4BJ United Kingdom | Company Registration number: SC222955 | Company VAT number: GB809428514