The Work Breakdown Structure (WBS)

The work breakdown structure (WBS) defines the work that is required in order to produce the product or deliverables. It is represented as a hierarchical subdivision of a project into work areas with the lowest generally being a work package or sometimes even an activity. The lowest level of the WBS should be consistent and agreed at the outset of the creation of the WBS. The WBS provides the foundation for all project management work, including planning, cost and effort estimation, resource allocation, and scheduling.
Creating a WBS:

  • enables the definition of the total scope of work
  • provides the ability to assign work to people responsible for carrying out the work
  • establishes a control baseline
  • measures accomplishments objectively when the work is done
  • defines, collects and reports information at the appropriate level required
  • defines the relationships between work, organisation and cost.

EXAMPLE OF A WORK BREAKDOWN STRUCTURE (WBS)

wbs-sample-full

The efficiency of a work breakdown structure can determine the success of a project.

Sitemap | © 20|20 Business Insight 2015. | A Wordpress Website by exSite
PRINCE2® is a registered trade mark of AXELOS Limited. The Swirl logo™ is a trade mark of AXELOS Limited.
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc. | PMI, PMP, CAPM and PMBOK are registered marks of the Project Management Institute, Inc.
20|20 Business Insight Ltd Registered Office: c/o Thorntons, 33 Yeaman Shore, Dundee, Angus DD1 4BJ | Company Registration number: SC222955 | Company VAT number: 809428514